The Reventazón Dam is a concrete-face rock-fill dam currently being constructed on the Reventazón River about southwest of Siquirres in Limón Province, Costa Rica. The primary purpose of the dam is hydroelectric power production and its power station will have an installed capacity of 296 MW, the largest in the country.〔(【引用サイトリンク】url=http://www.andritz.com/hydro/hydronews/hy-hydro-news-26/hy-26-21-reventazon.htm )〕 Construction on the dam began in 2009 and it is expected to be complete in 2016. At a height of and with a structural volume of , it will be the largest dam in Central America. To produce electricity, water from the reservoir is diverted about to the northeast where it reaches the power station along the Reventazón River. ==References==